The job
Unitec's Mt Albert campus, one of Auckland's largest tertiary campuses, had bulk water main valves failing with age. As a long-term client, Unitec relies on our systems and methodical approach to get these jobs done safely and with as little disruption to the campus as possible.
Each replacement followed the same sequence: services detection, asphalt cutting, hydro excavation to expose the main, then a planned system shut-down and cut-out of the old asbestos-cement (AC) pipework. The new valve assembly went together on site, was installed, and the ground and asphalt were fully reinstated.
Every part of the job is done in house, which keeps sub-contractors off a busy campus. We've completed multiple replacements on this site, and the client recognises our standards and reliability in keeping their operations safe and running.
What we did
- Services detection around the valve
- Asphalt cutting
- Hydro excavation to expose the main
- System shut-down
- Cut-out of the old asbestos-cement pipework
- New valve assembly, installation and full reinstatement
On site






Got a job like this? Call us for a free, no-obligation quote.
Free, no-obligation quote · Mon–Fri 8am–5pm · Auckland, Franklin & North Waikato
More projects
1–2 of 4

Māngere, South Auckland · August 2026
Wastewater Treatment Plant Service Mapping in Māngere
Before a major infrastructure project could start at the Māngere Wastewater Treatment Plant, our regular civil client needed every service on site found. We traced hundreds of pipes, ducts and cables across the plant, GPS-mapped them and delivered service plans, with in-depth health and safety planning for a challenging live site.
Read the case study
Pukekohe, Franklin · September 2026
Intersection Underground Service Detection in Pukekohe
Before civil works to upgrade a Pukekohe intersection with a new roundabout, footpath and lighting, our client needed the services found. We reviewed the available plans, traced the high and low voltage power network, communications and stormwater and wastewater drainage, then reported back so the contractors could dig around the services as safely as possible.
Read the case study